Clear Path

Menu

Public sample report

Planning-use sample

Sample Preliminary Obstacle Evaluation Report

A downloadable Clear Path report for a temporary crane screening at KMGM / Montgomery Regional (Dannelly Field). The sample uses the production all-runway report flow so each evaluated runway-end context appears in the PDF.

First page preview of the Clear Path sample preliminary obstacle evaluation report.

Planning-use limitations

Understand the sample before relying on it

SAMPLE / NOT FOR OPERATIONAL USE. This public example is a reproducible preliminary screening report. It is not FAA, DoD, airport sponsor, engineering, surveying, legal, or construction approval.

References to FAA, DoD, UFC, Part 77, airport criteria, or source documents identify evaluation inputs only. They do not imply endorsement, sponsorship, authorization, or official status by any agency, command, military unit, airport sponsor, or airport authority.

AirportKMGMMontgomery Regional (Dannelly Field)
ScenarioTemporary construction craneKMGM Air Traffic Control Tower Renovation - Temporary Crane Screening
Runway contexts410/28 ends 10 and 28; 03/21 ends 03 and 21
Sample resultViolationCivil Part 77 Horizontal Surface penetration: 119.00 ft

What the sample shows

  • All-runway aggregate reporting with one section for every evaluated runway-end context.
  • KMGM runway geometry, object coordinates, object elevation, and Part 77 criteria source traceability.
  • Plan-view and 3D engineering graphics generated from the same report data used by the evaluator.
  • Calculation rows showing allowable elevation, object top elevation, clearance, and penetration.
  • Known limitations and non-certification language that should remain attached when a report is shared.

PDF preview

Representative report pages

Select any page to inspect it at a larger size. The downloadable PDF contains all runway sections, source references, limitations, and non-certification text.

Download Complete 21-Page Report
Page 1Report cover and scope
Page 2Executive result summary
Page 4All-runway context matrix
Page 5Runway-specific calculation detail
Page 7Engineering plan view
Page 83D engineering view

Support and interpretation

For questions about report structure or workflow, contact support@airspaceevaluator.com. Include the PDF, generated timestamp, airport, runway context, object coordinates, app version v0.1.2, and criteria profile. Clear Path support can explain workflow and report structure, but does not issue approvals, certifications, or official determinations.